Clinkerization - Cement Plant Optimization
New coolers are designed for the capacity to be handled with the loading of 40-55 tpd of clinker cooled/m2 of grate area. Cooling air requirement is generally designed at nm3/kg-clinker. Either hammer crusher or roller crusher is used to break lumps of clinker before coming out from cooler. Water spray or Air to Air heat exchanger is
3 Comments
Miftahul Jannat
July 02, 2021Provide a sample analysis report, and conduct a feasibility study and analysis based on the local environmental topography.
Eleanor Fant
Jan 14, 2022The entire team tactfully delivered a project of exceptional quality while staying on schedule & under budget.
Philippe Jenvrin
Oct 25, 2020We have been using it for a period of time, the quality of the product is very good, we will consider working together again.